Skip to content

A sourced guide

Your car's charging port: Type 2, CCS2, GB/T and which fits Egypt's chargers

The charging connectors you will meet in Egypt, why they matter for cars imported from China, and how to check compatibility before buying and before every trip.

  • Published:
  • Updated:

Block sources: [1][2][3][4]

The standards you will hear about

  • Type 2: the connector EU rules require for normal AC charging points.
  • CCS2, or Combo 2: the combined charging system EU rules require for DC high-power charging points, and since 24 April 2025 the only standard Egypt's public fast chargers serve.
  • GB/T: the Chinese standard, used by some cars imported into Egypt, especially from China.

Block sources: [5][1][2]

Why this matters in Egypt

The mix of charging standards has worried some drivers in Egypt about whether their cars will stay compatible with stations. The issue shows most with cars imported individually from the Chinese market, whose version can differ from the one the official Egyptian distributor sells.

Block sources: [1]

How to check before you buy

  1. Ask the seller to write down the AC and DC charging ports of that exact car, not of another version of the model.
  2. If the car is imported, ask whether it is a Chinese-market version or one built for another market, and ask for proof.
  3. Open the networks' apps for your area: Infinity's app shows the charger types at each station, IKARUS shows port types, and Sha7en lets you filter chargers by connector.
  4. If the seller offers an adapter, ask who made it, whether the car maker or distributor approves it, what power it is rated for, and who is responsible if something fails.

Block sources: [6][7][8]

Block sources: [9][10]

Before every trip

  • Check in the app that the station you plan to stop at has a charger that fits your car's port, and that it is free if the app shows it.
  • Plan a back-up station: outside Greater Cairo and the main roads, stations are still limited.
  • Keep the car's own charging cable in good, dry condition.

Block sources: [6][1][10]

What to do next

Was this guide useful?

Sources and dates

1. بعد قرار الحكومة بتحويل سياراتها للكهرباء.. هل شبكة الشحن في مصر جاهزة؟

مصراوي

Read on:

Publication date:

Effective date: Unknown

2. في مصر.. أبرز السيارات الكهربائية المتضررة من توقف البروتوكول الصيني

مصراوي

Read on:

Publication date:

Effective date:

3. Could Chinese EV chargers be here to stay after all?

EnterpriseAM

Read on:

Publication date:

Effective date: Unknown

5. Directive 2014/94/EU on the deployment of alternative fuels infrastructure (Annex II, recharging points)

EUR-Lex (Official Journal of the European Union)

Read on:

Publication date: Unknown

Effective date: Unknown

6. InfinityEV (App Store, Egypt)

Apple App Store

Read on:

Publication date: Unknown

Effective date: Unknown

7. IKARUS Grid (App Store, Egypt)

Apple App Store

Read on:

Publication date: Unknown

Effective date: Unknown

8. Sha7en (App Store, Egypt)

Apple App Store

Read on:

Publication date: Unknown

Effective date: Unknown

9. Electric Vehicle Charging Safety Tips

US Fire Administration (FEMA)

Read on:

Publication date: Unknown

Effective date: Unknown

10. Safety Precautions for Charging Your Electric Vehicle (owner's manual)

Hyundai Motor Company

Read on:

Publication date: Unknown

Effective date: Unknown

Next step

Choose your car with the facts

Every trim with its specifications, source and date. When you decide, request written offers from every eligible party within 72 hours.

Open the catalogue

Read next